TUNISIA –TOTAL

PROJECT DETAILS

REQUALIFICATION OF LPG BULLET TANKS & UPGRADING OF EXISTING LPG PLANT

General

  • Period: 2017-2018
  • Situation: Ghannouch, TUNISIE
  • Customer: TOTAL

Services

Design – Procurement and Supervision

Description

  • Proceed with technical auditing of the existing installations and storage tanks according to TOTAL standards
  • Proceed with the engineering of the future installation in terms of :
    • Modification and requalification of the storage tanks
    • Upgrading of existing LPG installation
  • Proceed with the design of requalification procedures
  • Proceed with the procurement of equipment
  • Supervision of works keeping the site in operation

RELATED PROJECTS

  • BENIN – SOAGEL (PUMA)

    BARGE- CONSULTING- DEC- DESIGN- ENERGY- ENGINEERING- GAS- LPG- OGECO- OIL- SUPPLY- TECH. ASSISTANCE-

  • ALGERIA – NAFTAL

    BARGE- CONSULTING- DEC- DESIGN- ENERGY- ENGINEERING- GAS- LPG- OGECO- OIL- SUPPLY- TECH. ASSISTANCE-

  • UGANDA – ORYX ENERGIES

    BARGE- CONSULTING- DEC- DESIGN- ENERGY- ENGINEERING- GAS- LPG- OGECO- OIL- SUPPLY- TECH. ASSISTANCE-

  • KENYA – NOCK

    BARGE- CONSULTING- DEC- DESIGN- ENERGY- ENGINEERING- GAS- LPG- OGECO- OIL- SUPPLY- TECH. ASSISTANCE-