TANZANIA – ORYX ENERGIES

PROJECT DETAILS

LPG STORAGE PLANT EXTENSION

General

  • Period: 2014 – 2016
  • Situation: Dar Es Salam, TANZANIA
  • Customer: ORYX Energies

Services

Full turn-key extension and renovation contract to supply, erect and start up.

Description

  • LPG tanks (4x100m3)
  • LPG pumping stations (2 LPG pumps)
  • 2 loading/unloading bays with metering system
  • LPG network extension with piping, fittings and accessories
  • Extension of fire-fighting network with firewater pumps, piping, fittings and accessories
  • Compressed air network extension with piping, fittings and accessories
  • Instrumentation, switchboards, automatic control systems, gas and fire detection

RELATED PROJECTS

  • BENIN – SOAGEL (PUMA)

    BARGE- CONSULTING- DEC- DESIGN- ENERGY- ENGINEERING- GAS- LPG- OGECO- OIL- SUPPLY- TECH. ASSISTANCE-

  • ALGERIA – NAFTAL

    BARGE- CONSULTING- DEC- DESIGN- ENERGY- ENGINEERING- GAS- LPG- OGECO- OIL- SUPPLY- TECH. ASSISTANCE-

  • UGANDA – ORYX ENERGIES

    BARGE- CONSULTING- DEC- DESIGN- ENERGY- ENGINEERING- GAS- LPG- OGECO- OIL- SUPPLY- TECH. ASSISTANCE-

  • KENYA – NOCK

    BARGE- CONSULTING- DEC- DESIGN- ENERGY- ENGINEERING- GAS- LPG- OGECO- OIL- SUPPLY- TECH. ASSISTANCE-